Street Closure/Detour Information

Print
Press Enter to show all options, press Tab go to next option

TRAFFIC SIGNALS HATE THE HEAT!!

Traffic signal controller cabinets are state certified to run between -30 to 140 degrees. Our signal maintenance contractor reports the cabinets in the City of Palm Springs are well over 180 degrees inside.  The contractor done what they can to increase the airflow inside the cabinet but it is only circulating the extremely hot air.  Until the heat wave subsides, expect more traffic signals to trip to four-way flash. Please report it to the City with this link and practice patience at intersections.

****************************************** 

 RESCHEDULED TO DATES BELOW

VISTA CHINO REDUCED TO ONE LANE EACH WAY
btw
CLUBHOUSE DRIVE (Palm Springs) & CARMELA DRIVE (Cathedral City)

October 1 - November 1, 2018 
Mon-Fri 7:00am -4:00pm

The WESTBOUND lanes of VISTA CHINO through the Whitewater Wash will be CLOSED for additional soil boring for proposed bridge. WESTBOUND and EASTBOUND traffic will be REDUCED to ONE LANE  EACH WAY in the EASTBOUND side of VISTA CHINO.

 *****USE ALTERNATE ROUTES DURING MORNING

COMMUTE TO AVOID DELAYS*****

 

******************************************

CLOSURE OF CURB LANE ON NORTHBOUND S PALM CANYON DRIVE

September 10 -  October 12, 2018
Mon-Fri 7:00am -4:0pm

The CURB LANE north of MESQUITE AVENUE will be CLOSED for construction. Traffic will be REDUCED TO ONE LANE NORTHBOUND. This closure would allow contractors for the CAMERON PROJECT to complete IRRIGATION, CURBS, and SIDEWALKS along S PALM CANYON.

 *****USE ALTERNATE ROUTES TO AVOID DELAYS*****

 

******************************************

PAVEMENT REHABILITATION PROJECT 18-01 

September 2018 - February 2019
Mon-Fri 7:00am -4:0pm

Complete removal of asphalt and partial base. Replacement of base course, asphalt, and new striping for all roads on the project street list.

For issues or concerns please call 760-961-5142 and leave a message.

You will received a return call within 24 hours.

 *****SLOW FOR THE CONE ZONE AND

FOLLOW CONTRACTOR TRAFFIC CONTROL*****

 

******************************************

 

PALM SPRINGS VILLAGE FEST

Palm Canyon Drive is CLOSED every THURSDAY
6:00pm - 10:00 pm

Btw Amado Road- Baristo Road.

*****OBEY ALL TRAFFIC CONTROL SIGNS AND WATCH FOR THE CONE ZONE*****

 

SLOW FOR THE CONE ZONE

Maintenance and Operations workers risk their lives every day working on open freeways, highways, and local roads and are true unsung heroes of transportation.The following tips are to help you stay safe while traveling through maintenance and construction work zones. Motorists can make trips a little safer by remembering the following work zone safety tips.

  • Do not speed in work zones; obey the posted speed limits.

  • Stay Alert! Expect the unexpected.

  • Watch for workers; drive with caution.

  • Don't change lanes unnecessarily.

  • Avoid using mobile phones while driving in work zones.

  • Turn on headlights so that workers and other drivers can see you.

  • Be especially alert at night while driving in work zones.

  • Expect delays, especially during peak travel times.

  • Allow ample space between you and the car in front of you.

  • Anticipate lane shifts, and merge when directed to do so.

  • Be Patient and SLOW DOWN in construction zones!

LATEST PALM SPRINGS WEATHER

EXTERNAL LINKS