Street Closure/Detour Information

Print
Press Enter to show all options, press Tab go to next option

CURRENT STREET WORK

++++++++++ SOCAL GAS CONSTRUCTION+++++++++ 

GAS MAIN ON SUNRISE WAY BETWEEN
RACQUET CLUB DR. AND VIA ESCUELA

June 27, 2017 thru July 21, 2017 - 7:00AM - 4:00PM

Lane #2 NB will be CLOSED between intersecting streets
Curb lane will be CLOSED during construction - Stay to the LEFT.

*****OBEY ALL TRAFFIC CONTROL SIGNS AND
USE ALTERNATE ROUTES IF NEEDED
*****

++++++++++ ROAD CONSTRUCTION+++++++++ 

San Joaquin Drive Street Improvements

West Side of San Joaquin between Mission Drive
and San Jose Drive (located north of The Springs
Shopping Center and east of Gene Autry Trail).

Tuesday, June 27 thru Friday, June 30, 2017 - 7:00AM - 4:00PM

Intermittent traffic control and flagmen will be in place
near intersecting streets and along the construction area.

*****OBEY ALL TRAFFIC CONTROL SIGNS AN

USE ALTERNATE ROUTES IF POSSIBLE*****

 

++++++++++ DOWNTOWN CONSTRUCTION+++++++++ 

A.D.A. RAMPS along RAMON ROAD

Intersecting Streets on the South Side of Ramon
between Belardo Road and Sunrise Way
and between El Cielo Rd & Gene Autry Way

June 12, 2017 thru July 12, 2017 - 7:00AM - 4:00PM

Intermittent traffic control will be in place near intersecting streets
on the South side of Ramon Road  within both construction areas.

*****OBEY ALL TRAFFIC CONTROL SIGNS AND

STAY TO LEFT ON EASTBOUND LANES*****

 

CP 16-0: ROADWAY REHABILITATION

JULY 10 - AUGUST 31, 2017 - 7:00AM - 4:00PM

  •  West Arenas Road between South Tahquitz and South Belardo.
  •  Indian Canyon from Alejo to 600 feet south.
  •  Tahquitz/Belardo intersection. Installation of decorative pavers.
  •  Vineyard Parking Lot,  at the northeast corner of Belardo and Baristo roads.

Traffic control will be in place during construction hours.

*****OBEY ALL TRAFFIC CONTROL SIGNS

AND USE ALTERNATE ROUTES*****

 

SPA CASINO PARKING STRUCTURE CONSTRUCTION

Amado Road between Calle Encilia and Calle El Segundo
August 2016 - June 2017

Portions of sidewalk along Calle El Segundo and Amado Road
will be CLOSED to pedestrian traffic during construction.

*****OBEY ALL PEDESTRIAN CONTROL SIGNS AND USE NEW PARKING LOT
AND ENTRANCE ON SOUTH SIDE OF CASINO *****

 

+++++++SPECIAL EVENTS ROAD CLOSURES+++++++

PALM SPRINGS VILLAGE FEST

Palm Canyon Drive is CLOSED every THURSDAY

6:00pm - 10:00 pm

from Amado Road- Baristo Road.

  

<<<<<<<END>>>>>>

 

SLOW FOR THE CONE ZONE

Maintenance and Operations workers risk their lives every day working on open freeways, highways, and local roads and are true unsung heroes of transportation.The following tips are to help you stay safe while traveling through maintenance and construction work zones. Motorists can make trips a little safer by remembering the following work zone safety tips.

  • Do not speed in work zones; obey the posted speed limits.
  • Stay Alert! Expect the unexpected.
  • Watch for workers; drive with caution.
  • Don't change lanes unnecessarily.
  • Avoid using mobile phones while driving in work zones.
  • Turn on headlights so that workers and other drivers can see you.
  • Be especially alert at night while driving in work zones.
  • Expect delays, especially during peak travel times.
  • Allow ample space between you and the car in front of you.
  • Anticipate lane shifts, and merge when directed to do so.
  • Be Patient and SLOW DOWN in construction zones!

TRAFFIC TEXT ALERTS

 
NIXLE is becoming EB everbridge logo.

 

LATEST WEATHER CONDITIONS

Click HERE  for the latest weather conditions.

EXTERNAL LINKS

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer