Capital Improvement Projects
Interactive Map
Link to Capital Improvement Projects (CIP) Interactive Map here
CP 01-11 INDIAN CANYON BRIDGE
Project Contact Info: (760) 203-5224, Andrew.Beebe@weareharris.com
Status - Construction In Progress
The Indian Canyon Bridge project is a federally funded bridge project that was started in 2001. This project will replace the two-lane bridge that goes over the Union Pacific Railroad tracks with a six-lane bridge and install the sewer infrastructure within the project footprint. For additional information, please visit: https://indiancanyonproject.com/ .
AS PART OF THE ONGOING INDIAN CANYON WIDENING & BRIDGE REPLACEMENT PROJECT THERE WILL BE A FULL CLOSURE OF INDIAN CANYON DRIVE BETWEEN PALM SPRINGS STATION ROAD AND GARNET AVENUE BEGINNING MONDAY, 11/17 AT 2AM WITH AN ANTICIPATED OPENING ON THURSDAY, 11/20 AT 6PM OR EARLIER.
Access for emergency vehicles will be maintained through the work zone throughout the indicated closure.
PLEASE USE ALTERNATE ROUTES TO AVOID TRAFFIC CONGESTION AND EXPECT DELAYS AROUND THE AFFECTED AREAS.
STAY INFORMED:
Project Hotline: (760) 203-5224
Construction Manager Andrew Beebe: (949) 396-4735
Email: andrew.beebe@weareharris.com
CP 12-02 SOUTH PALM CANYON BRIDGE NEAR TAHQUITZ CREEK
Project Contact Info: (760) 502-0072, info@southpalmcanyonbridge.com
Status -Construction in Progress
The existing bridge, originally constructed in 1930, is outdated and structurally deficient. Also, the current bridge approach configuration creates a bottleneck for traffic on S. Palm Canyon Drive. The proposed project will replace the existing bridge to address its outdated structure, safety concerns, and the traffic bottleneck it creates. For additional information, please visit: https://southpalmcanyonbridge.com/.
The work will include:
- Demolition and reconstruction of the bridge over the Tahquitz Creek Channel.
- Reconstruction of the channel slopes around the bridge.
- Street reconstruction of South Palm Canyon Drive, which includes new curb and gutter, sidewalks, and storm drains.
- Installation of new landscaped medians and parkways.
- New traffic signal improvements.
- Installation of a domestic waterline.
- New street lighting and striping.
Project Updates and Contact
- For the most current updates, please visit https://southpalmcanyonbridge.com/
- Questions or Concerns, please reach out to us via:
- Call: (760) 502-0072
- Email: info@southpalmcanyonbridge.com
Businesses remain open – Support Local!
- An interactive map of adjunct businesses can be found at
More info at www.SouthPalmCanyonBridge.com(External link) or call (760) 502-0072.
STAY INFORMED:
Call: (760) 502-0072
Email: info@southpalmcanyonbridge.com
CP 18-04 PLAZA THEATRE
Status - Construction In Progress
CP 16-08 LIBRARY RENOVATION
Status -Construction Contract Awarded
CP 22-24 DEMUTH PARK PICKLEBALL
Status - Construction Upcoming (Sept. 2025)
Project Contact Info:
Hotline (760) 846-5477 and Email: DeMuthPickleball@palmspringsca.gov
Project Background
The City’s twelve (12) existing pickleball courts are located at Demuth Park at 4375 E. Mesquite Avenue. The courts are highly utilized year-round and provide a free health and wellness recreational amenity for the community. The Parks & Recreation Commission and members of the pickleball community mutually agreed that there was a need to increase the number of courts available in Palm Springs to better meet the high demands of players in the growing pickleball community, as well as to create a cohesive design and better-functioning recreational amenity.
Construction Scope of work
The work comprises demolishing existing Pickleball Courts, Tennis Court, picnic areas and surrounding park space. Construction includes 22 new Pickleball courts with seating areas, planters, drinking fountains, courts, lighting, drainage retention area, shade structures throughout, and new electrical service upgrade. The construction costs for this project is approximately $5.1 Million and is funded partially through Measure J.
Note – The playground, restrooms, and parking lot will remain open during construction. There may be portions of the parking lot that may need to be reserved for construction equipment at a later date.
Temporary Pickleball Courts
To ensure continued access to pickleball during the construction period, the City has partnered with the College of the Desert to provide 12 temporary courts near the College's satellite campus on S. Hermosa Drive, near E. Baristo Road. These temporary courts are now open for use.
Status - Construction in Progress
The Project will start construction towards the end of September 2025 and will be completed by Summer 2026.
Project Updates and Contact
- For the most current updates, please visit https://engagepalmsprings.com/
- Questions or Concerns, please reach out to us via:
- Call: (760) 846-5477
- Email: DeMuthPickleball@palmspringsca.gov
CP 25-02 CITYWIDE SLURRY SEAL
Project Hotline: (760) 846-5477
American Asphalt South (Contractor): (909) 427-8276
Status - Slurry to begin week of 12/15/25.
PLEASE NOTE: The Southbound side of Indian Canyon Drive between N/S 19th Avenue and North City Limits will be slurried Tuesday, 12/16/25 and Wednesday, 12/17/25. Please use alternate routes.
Slurry schedule is available HERE.
Contractor's Notice to Residents (English & Spanish) is available HERE.
AS REPAVING AND SLURRYING ARE ORDINARILY ANNUAL, PLEASE CLICK HERE TO VISIT THE STREET PAVEMENT MANAGEMENT WEBPAGE TO REVIEW THE LATEST LISTS OF STREETS CURRENTLY CONSIDERED FOR THE NEXT FEW YEARS.
CP 01-11B INDIAN CANYON DRIVE SEWER PHASE 2
Status - Construction In Progress
This project comprises the installation of approximately 8,875 linear feet of 10-inch PVC sewer pipeline along North Indian Canyon Avenue from, including the construction of 24 manholes. The pipe will have an average depth of 7 feet, with some sections reaching up to 11 feet. A portion of the pipeline, approximately 1,200 feet, will require microtunneling beneath existing Jointed Plain Concrete Pavement (JPCP), necessitating the construction of launch and reception shafts. The remaining 7,675 feet will be installed using open-cut trenching methods. The project will encompass site preparation, including surveying, utility locates, traffic control, and erosion control. Installation will involve excavation, pipe laying, backfilling, and repair of the installation trench and removed asphalt concrete. Manhole construction will include excavation, installation of precast or cast-in-place structures, and secure pipe connections. All disturbed areas will be restored to city’s specified condition.
Schedule – Utility location work in the area from Tramway Road to Sunrise Parkway on Wednesday July 23rd working through Friday July 25th this week. This will affect both Northbound lanes at different stretches. Construction is projected to continue through May 2026.
The installation will involve a combination of tunneling beneath concrete pavement in certain areas and open trench methods for the majority of the pipeline. As work progresses, the project will impact both the No. 1 North and Southbound lanes of Indian Canyon Drive, necessitating periodic lane closures in specific sections of the road.
Please exercise caution when traveling through the construction zone and be aware of changing traffic patterns. The Construction Managers will be providing periodic updates on the project as it progresses.
PLEASE USE ALTERNATE ROUTES TO AVOID TRAFFIC CONGESTION AND EXPECT DELAYS AROUND THE AFFECTED AREAS.
Sewer location map showing Phase 1 (already in construction under 01-11) and Phase 2 (this project, which will connect to Phase 1)
CP 23-13 WWTP ODOR CONTROL IMPROVEMENTS
Status - Design In Progress
CP 24-04 STATE HIGHWAY MANHOLE REPAIRS
Project Contact Info: Tri-Star Contracting (760) 251-5454
Status - Construction In Progress
This project will rehabilitate 58 sanitary sewer manholes along SR 111 (Gene Autry Trail and Vista Chino) in Palm Springs. Work includes replacing manhole frames and covers, adjusting them to grade, and replacing concrete collars and manhole lids. This project provides several key benefits by rehabilitating 58 sanitary sewer manholes in Palm Springs.
The work will include:
-
Adjusting the manhole frames and covers to match the road grade and replacing damaged components creates a smoother road surface.
-
This rehabilitation project is a proactive investment in the city's critical infrastructure by repairing and maintaining sewer infrastructure, the city ensures services will be available and reliable.
-
Eliminates noisy, rattling manhole covers, reducing a common source of traffic noise for nearby homes and businesses.
Schedule - Construction on manholes along Vista Chino between Indian Canyon Drive and Via Miraleste will begin Friday, 8/21/25, at 7AM. Lane closures are required, mainly affecting the eastbound lanes in that segment.
CP 25-03 STORM DRAIN LINE 6, STAGE 3
Status - Initial Planning
CP18-05 HSIP CYCLE 9
Status - Design In Progress
CP 22-11AB SOUTH PALM CANYON & RACQUET CLUB LANE RECONFIGURATION
Status - Design In Progress
CP 23-12 HSIP CYCLE 11
Status - Design In Progress
CP 24-05 INDIAN CANYON DR. x VIA ESCUELA TRAFFIC SIGNAL INSTALLATION
Project Contact Info: (760) 323-8253 x8740; Anthony.Acosta@palmspringsca.gov
Status - Construction Contract Awarded
The City of Palm Springs has awarded a construction contract to California Professional Engineering, Inc. for the installation of a new traffic signal at the intersection of Indian Canyon Drive & Via Escuela.
Because traffic signal poles require a significant fabrication period, major construction activity is not expected to begin until late Spring or early Summer 2026. The project is anticipated to be completed between late Summer and early Fall 2026.
Why is this traffic signal being installed?
As identified in the City’s Local Road Safety Plan (LRSP) and through community feedback, this intersection has been recognized as a location that would benefit from roadway safety improvements. The LRSP recommends installing a traffic signal here to enhance safety for all roadway users.
In the meantime, minor intermittent work, such as underground utility potholing, may occur prior to major construction. Traffic impacts during this early preparatory work are expected to be minimal.
If you have any questions please feel free to contact Anthony Acosta at 760-323-8253 ext. 8740 or by email at anthony.acosta@palmspringsca.gov.