Show/Hide

Street Closure/Detour Information

Print
Press Enter to show all options, press Tab go to next option

CLICK HERE to sign up with EVERBRIDGE.  Choose which alerts you want to receive on your mobile device from PSPD or PSFD regarding traffic incidents or road closures 24/7.

(NB = Northbound | SB = Southbound | WB = Westbound | EB = Eastbound)

****NEW SIGNAL CONSTRUCTION AT SUNRISE PARKWAY****

MARCH 31 - APR 3, 2020 ~ 7:00AM - 3:30PM
APR 6 - 10, 2020 ~ 7:00AM - 3:30PM

CONSTRUCTION OF A NEW TRAFFIC SIGNAL AT INDIAN CANYON DRIVE AT SUNRISE PARKWAY. SUNRISE PARKWAY IS NORTH OF THE MIRALON DEVELOPMENT ON THE EAST SIDE OF INDIAN CANYON DRIVE. THEY WILL CLOSE BOTH CURB-SIDE NB & SB LANES AND REDUCE TWO-LANE TRAVEL TO ONE LANE EACH WAY DURING CONSTRUCTION HOURS.

*****EXPECT DELAYS AND SLOW FOR THE CONE ZONE*****

 

***PRIVATE DEVELOPMENT STREET WORK***

**** SB INDIAN CANYON DR @ SAN RAFAEL DRIVE****

MARCH 30 - APR 2, 2020 ~ 7:00AM-3:00PM

SoCal Gas contractor will be installing a gas lateral across Calle Encilia btw Tahquitz and Andreas Road. Traffic w  

*****EXPECT DELAY DURING COMMUTE HOURS AND USE ALTERNATE ROUTES AS NEEDED*****

 

***SOCAL EDISON VAULT WORK***

****SB INDIAN CANYON DRIVE AT ALEJO ROAD****

MONDAY MARCH 30 - TUESDAY MARCH 31, 2020

7:00AM - 2:00AM

SCE crews will CLOSE the SB THRU-LANE on Indian Canyon Drive at Alejo Road. LEFT-TURN and RIGHT-TURN pockets will still be OPEN. They will be installing a new vault restraint system. Work will begin Monday morning and conclude early morning on Tuesday.

 

****SB INDIAN CANYON DRIVE AT ARENAS ROAD****

TUESDAY MARCH 31 - WEDNESDAY APRIL 1, 2020

9:00PM - 5:00AM

SCE crews will CLOSE the SB THRU-LANE on Indian Canyon Drive at Arenas Road. LEFT-TURN and pocket will still be OPEN. They will be installing a new vault restraint system. Work will begin Tuesday night and conclude early morning on Wednesday.

 

*****EXPECT DELAYS AND USE ALTERNATE ROUTES AS NEEDED*****

 

***SOCAL GAS WORK***

****WILLIAMS ROAD BTW MESQUITE AVE AND EUGENE ROAD****

MARCH 23 - APRIL 2, 2020

7:00AM - 3:30 PM

SoCal Gas working on east side of  Williams Rd btw Mesquite Avenue and Eugene Road. Crews will be taking up the east parking space and narrowing the NB travel lane to single lane. Turn lanes maybe shut down at times for installation of new gas crossing. 

****CALLE ENCILIA BTW TAHQUITZ CYN WAY AND ANDREAS ROAD****

MARCH 26 - APRIL 10, 2020

7:00AM - 4:00 PM

SoCal Gas contractor will be installing a gas lateral across Calle Encilia. Travel lanes will be reduced to one lane SB and one lane NB. Bike lanes and parking lanes will be CLOSED within this section of Calle Encilia during construction.

 

*****EXPECT DELAYS DURING THESE PROJECTS AND USE ALTERNATE ROUTES AS NEEDED*****

 

*****MAJOR I-10 ROAD CONSTRUCTION 2020-2022***** 

FEBRUARY 2020 -DECEMBER 2022

CALTRANS I-10 PAVEMENT REHAB BTW BEAUMONT & SR 111

 $215.9 million pavement preservation project will replace and improve 133.3 lane miles of Interstate 10 from Pennsylvania Avenue in the city of Beaumont to State Route 111 Junction near the town of Whitewater in Riverside County. This project was allocated $215.9 million, $18.2 million in funding was due to Senate Bill 1.

For the latest update call 833-410-8863 or

http://i10tuneup.com/updates/

For additional information contact:

Terri Kasinga
Chief, Public and Media Affairs
Caltrans District 8
(909) 383-4646 Office
(951) 232-4268 Cell

*****EXPECT DELAYS ON EASTBOUND & WESTBOUND I-10

BTW BEAUMONT AND SR 111 IN PALM SPRINGS*****

 

*****RIVERSIDE COUNTY FLOOD CONTROL***** 

**** TAHQUITZ CREEK DEBRIS BASIN SEDIMENT IS COMPLETED****

+++SEDIMENT REMOVAL FOR PALM CANYON WASH IS COMPLETED.+++

     

*****MAJOR SR-60 ROAD CONSTRUCTION 2019-2021***** 

 JULY 26, 2019 - JULY 2021

1/31/20 - 2/3/20: 55 HOUR ROAD/RAMP CLOSURE LIST

 Pavement rehabilitation and bridge replacement project on SR 60 btw I-15 and I-215/I-91.

The “60 Swarm” will begin on Friday, July 26. Caltrans has two projects in construction on State Route 60, one for paving and the other for the replacement of three bridges between State Route 71 and the 60/91/215 Junction at an estimated cost of $170 Million. The paving project will require fifteen (15) consecutive weekends (except for Labor Day) of full directional closures on SR 60 from I-15 to 60/91/215 Jct. (12 miles).

All lanes and ramps will be closed during the work from Fridays at 10:00 p.m. to Mondays at 5:00 a.m.

Partner transportation agencies have projects that correlate with Caltrans projects that also affect motorists.

 CHECK THE WEBSITE FOR THE LATEST CLOSURES.

For further questions contact Kimberly Cherry at

CalTrans District 8 at 909-383-6290 or TTY 711.

 

*****SPECIAL EVENTS***** 

PALM SPRINGS VILLAGE FEST

SUSPENDED UNTIL FURTHER NOTICE

  

SLOW FOR THE CONE ZONE

Maintenance and Operations workers risk their lives every day working on open freeways, highways, and local roads and are true unsung heroes of transportation.The following tips are to help you stay safe while traveling through maintenance and construction work zones. Motorists can make trips a little safer by remembering the following work zone safety tips.

  • Do not speed in work zones; obey the posted speed limits.

  • Stay Alert! Expect the unexpected.

  • Watch for workers; drive with caution.

  • Don't change lanes unnecessarily.

  • Avoid using mobile phones while driving in work zones.

  • Turn on headlights so that workers and other drivers can see you.

  • Be especially alert at night while driving in work zones.

  • Expect delays, especially during peak travel times.

  • Allow ample space between you and the car in front of you.

  • Anticipate lane shifts, and merge when directed to do so.

  • Be Patient and SLOW DOWN in construction zones!

LATEST PALM SPRINGS WEATHER

EXTERNAL LINKS